H1B Atlas

Construction Scheduler H1B Salary, Wage Levels & Top Sponsors

SOC Code: 13-1082.00
SOC Category: Project Management Specialists

LCA FY2024-FY2026 · PERM FY2024-FY2026 · USCIS Employer Data Hub FY2020–FY2023 · BLS OEWS May 2025

Updated 2026-11-21

Macro Wage Baseline (BLS OEWS May 2025)

+22.2%
Filed H-1B base wages show $125,008 vs National historical benchmark (BLS OEWS May 2025) $102,320

Construction Scheduler (SOC 13-1082.00, Project Management Specialists) accounts for 11 H-1B LCA filing records in the FY2024-FY2026 DOL dataset, placing it as a specialized sponsored occupation. Filed annual base wages span $85,000 to $140,000 from the 10th to 90th percentile, with a median base wage of $125,008. Filed H-1B base wages for this title track above the BLS occupational wage reference ($102,320). Figures summarize public DOL LCA salary and prevailing wage-level disclosures submitted by U.S. sponsoring employers.

Median Salary

$125,008

H-1B LCA Filings

11 LCA records

P90 Filed Base Wage

$140,000

DOL Prevailing Wage Level Distribution (Level I–IV)

10 level-tagged LCA filings

Across 10 DOL LCA filings with a recorded prevailing wage tier for Construction Scheduler, 60% (6 filings) are filed at Wage Level III or Level IV, with Level IV (Fully Competent) representing the largest tier.

Wage TierFilingsShare
Level I (Entry)1
10%
Level II (Qualified)3
30%
Level III (Experienced)0
0%
Level IV (Fully Competent)6
60%

Check official 2026–27 DOL Level I–IV prevailing wages for SOC 13-1082 in your exact U.S. metro area or county.

Open Wage Level Calculator →

LCA records by DOL disclosure fiscal year

DOL groups records by the disclosure fiscal year of the final determination. The chart compares complete full-year periods.

Multi-period view
FY24: 2 FY25: 1 FY26: 8
How H1B Atlas separates DOL LCA, PERM, USCIS I-129, and BLS wage records
Public filing data is normalized across six official U.S. federal datasets and registries: DOL LCA base wages and prevailing wage levels, DOL PERM labor certification filings, USCIS I-129 initial vs. continuing petition decisions, BLS OEWS May 2025 national wage survey benchmarks, DOL OFLC 2026–27 prevailing wage tables, and NCES IPEDS / NSF FFRDC cap-exempt registries.

Role Filing Pattern

Construction Scheduler appears as a specialized H-1B LCA job title in the FY2024-FY2026 DOL dataset, representing 11 submitted Labor Condition Application records with base pay and worksite disclosures.

Employer Concentration

Leading H-1B sponsors for Construction Scheduler include W. G. Yates and Sons Construction Co., Arcadis U.S., Inc., Consertus, Inc., Johnson, Mirmiran & Thompson, Inc., and U.S. Cost Inc., reflecting cumulative public LCA filing counts across covered fiscal years.

Location Pattern

Primary H-1B worksite metros for this occupation include Austin, TX, Birmingham, AL, Byhalia, MS, Dallas, TX, and DFW Airport, TX. Regional base wage differences track local BLS prevailing wage brackets, role seniority, and employer mix.

BLS Benchmark Context

The National historical benchmark (BLS OEWS May 2025) summarizes U.S. occupational pay. The OFLC 2026–27 schedules give prevailing wage estimates by occupation and area.

Salary Distribution (Base)

LCA filings

P10, P25, median, P75, and P90 among valid annualized wage records in the selected dataset.

P10 $85,000
P25 $92,004
Median $125,008
P75 $140,000
P90 $140,000

Top Employers by LCA Filings

Filed Wage by City

Frequently Asked Questions

What is the median filed H-1B LCA wage for Construction Scheduler?
The median filed base salary for Construction Scheduler H-1B LCA records is $125,008 per year.
How many Construction Scheduler H-1B LCA filings are recorded?
There are 11 Labor Condition Applications recorded for Construction Scheduler across FY2024-FY2026.
Which employers file H-1B LCAs for Construction Scheduler?
Leading employers filing H-1B LCAs for Construction Scheduler include W. G. Yates and Sons Construction Co., Arcadis U.S., Inc., Consertus, Inc..

Related H-1B pages